| PRELIMINARY
ENGINEER'S OPINION OF |
|
| PROBABLE
CONSTRUCTION COSTS FOR PROPOSED BIKEPATH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| September
11, 2007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| Hunt Club Woods |
|
|
|
|
|
|
|
|
| Homer
Glen, ILLINIOS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PREPARED FOR: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PREPARED BY: |
DesignTek
Engineering, Inc. |
|
|
|
|
9500 Bormet
Drive, Suite 304 |
|
|
|
|
Mokena,
Illinois 60448 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Project Number:
07-0042 |
|
|
|
|
|
| C:\Documents and Settings\peterb\Local
Settings\Temp\[07-0042 Preliminary Cost Estimate-5.xls]Cost Estimate |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hunt Club Woods |
|
|
|
|
|
|
Homer Glen, Illinois |
|
|
|
|
|
|
|
|
|
|
|
|
| PRELIMINARY ENGINEER'S OPINION OF |
|
| PROBABLE CONSTRUCTION COSTS FOR PROPOSED BIKEPATH |
|
|
|
|
|
|
|
|
| NO. |
ITEM |
UN |
QUANTITY |
UNIT
COST |
TOTAL
AMOUNT |
|
|
|
|
|
|
|
|
| GRADING |
|
|
|
|
|
| 1 |
Topsoil
Excavation |
CY |
417
|
$3.00 |
$1,250.00 |
|
| 2 |
Earth
Excavation |
CY |
113
|
$4.00 |
$453.33 |
|
| 3 |
Topsoil
Respread (Disturbed Area) |
CY |
278
|
$2.75 |
$763.89 |
|
| 4 |
Seeding |
AC |
0.35 |
$3,750.00 |
$1,312.50 |
|
| 5 |
Silt
Fence |
LF |
1,500 |
$2.05 |
$3,075.00 |
|
|
|
TOTAL GRADING |
|
$6,854.72
|
|
|
|
|
|
|
|
|
| PAVING |
|
|
|
|
|
| 1 |
8"
Agg. Base, CA-6, Type B |
SY |
833 |
$5.25 |
$4,375.00 |
|
| 2 |
Bit.
Mat'l, Prime Coat (0.30 gal/SY) |
GL |
250 |
$1.50 |
$374.85 |
|
| 3 |
2"
Bit. Conc. Surface Course, Cl. I |
SY |
833 |
$4.50 |
$3,748.50 |
|
|
|
TOTAL PAVING |
|
$8,498.35 |
|
|
|
|
|
|
|
|
| STORM SEWER |
|
|
|
|
|
| 1 |
12"
Dia. RCP |
LF |
32 |
$18.50 |
$592.00 |
|
| 2 |
12" Conc.Flared End Section |
EA |
2 |
$500.00 |
$1,000.00 |
|
| 3 |
Trench
Backfill Material |
CY |
4 |
$17.00 |
$68.00 |
|
|
|
TOTAL STORM
SEWER |
$1,660.00 |
|
|
|
|
|
|
|
|
| SUMMARY |
|
|
|
|
|
| |
GRADING |
|
|
|
$6,854.72 |
|
| |
PAVING |
|
|
|
$8,498.35 |
|
| |
STORM SEWER |
|
|
|
$1,660.00
|
|
|
|
TOTAL |
|
$17,013.07 |
|